BATTENFELD INJECTION MACHINE TRANSFER
Location: NBHX Bruchsal (Heilsbronn)
Relocation: NBHX Rolem – Olympian Park
Period: May-June 2017
COMPLETE LINE OF INDUSTRIAL ROBOTS „STAUBLI” TRANSFER
Location: NBHX Heilsbronn
Relocation : NBHX Rolem – Olympian Park
Period: June to September 2016
MILLING MACHINE TRANSFER – plastic injection
Location: EIMA NBHX Bruchsal (Heilsbronn)
Relocation: NBHX Rolem – Olympian Park
Period: June to September 2016
TRANSFER EQUIPMENT KRAUSSS MAFFEI – plastic injection – TRANSFER
Location: NBHX Heilsbronn
Relocation: NBHX Rolem – Olympian Park
Period: July to November 2016
LAQUER CABINS TRANSFER
Location: NBHX Cheb Czech Republic
Relocation: NBHX Rolem Codlea – NBHX Cheb Czech Republic
Period: October-November 2016
SHEET METAL PROCESSING MACHINES
Location: Dexion Laubach (Germany)
Relocation: Dexion Rasnov
Period: November 2016 – March 2017
Presses, punching and cutting universal
In the period November 2016 – March 2017, a team of locksmiths mechanics, electro-mechanics, successfully started the transfer of more than 25 construction equipment storage racks.
INTERNAL MOVING MACHINES – SCHAEFFLER ROMANIA
Equipment induction Hardening: EMA Induction Technology
Group SAET EMMEDI
Turning Maschines: DISKUS, PITTLER, SUPFINA, HEMBRUG
Period: November 2016 – March 2017
In 2016-February period – a team of locksmiths mechanics, electro-mechanics, started successfully removing and preserving an inductive hardening machine EMA INDUTEC, and later – in December 2016 to make moving, installation and commissioning his. The biggest challenge was because between disassembly and assembly there was a long period but data collected from disassembly, technical documentation available, and the team of professionals who participated succeed putting into operation of the machine.
MOVING chroming line
Location: Stabilus Romania Brasov
Relocation: METALSIL Codlea
Period: November 2013 – April 2014
DISASSEMBLE AND DECOMMISIONNING OF COMPLETE PRODUCTION LINES
In the summer of 2017 it was successfully completed project for dismantling equipment Comas. The work consisted of removing the three areas of production for upgrading and transferring certain lines in different European countries.
All this was possible due to good cooperation between team bosses present OHS team, project manager and not least Tabbaco Machinery manufacturer untilajelor Comas.
We developed successfully during January-March 2016, as general contractor, project disassembly of equipment and all related installations Brasov- GlasoSmithKline Europharm factory.
The biggest challenge came from the Health and Safety Work and Safety Workers teams, that took care that all dismantling work was done in accordance with the requirements of Safety and Health at Work so that no incident would occur during the whole period project.
DISMANTLING OF COMAS MACHINERY TABACCO
Location: PHILIP MORRIS ROMANIA
relocation:
Period: July 2017 September 2017
References: Schaeffler Romania Brasov – Maintenance of Hardening Furnance
During December-January 2016, a team of mechanics and electricians have carried out regular maintenance of one of the hardening and tempering furnaces – company Schaeffler Romania Brasov. The work consists in changing element bearings, roller transport, burners, burner tubes, rings, chains, transport and other used components.
-Networks external power supply water
– Networks outer sewage water housekeeper and rain
– Networks external power supply water fire
– stations for swapping- Households of water
– Bransamente
– Air medical interior
– Air sewer storm
– Air hydrants interior and exterior
HIBROM CODLEA
– water pump stations
– sprinkler installations
– main and secondary distribution system
– Installation of exterior and interior lighting
– Installation of lightning protection, grounding and cathodic protection
– Equipment for power factor correction
– Equipment for measuring electricity
– low voltage installations (protection, automation, telecommunication cable, etc.) related
electrical network
– electrical distribution and automation
HIBROM CODLEA
MOUNTING SYSTEMS
S.C. RGT SRL SF GHEORGHE
AIR CONDITIONING SYSTEMS
Soon!
Works contracted with the German company Bimont , the following locations:
Design and metal platform “Deposit preforms”
Abur- three central heating installation, boilers “LOOS” A3200kg / h